Leading Online Architectural Design Platform
Get Free Quotes Within Minutes
Width
Depth
Plot Area
Floors
Total builtup area
Building Type
Building Category
Style
Cost
Estimated cost of construction
Bedroom
Living Room
Drawing hall
Dining Room
Bathroom
kitchen
Hall
Lift
Egg Store
Office Area
Reception Area
Meeting Room
Puja Room
This 39x45 house plan has a total built-up area of 7,020 sq ft across 4 storeys, on a 1,755 sq ft plot.
This 39x45 house plan is a 1 BHK house design with 1 bedroom.
Yes, this 39x45 house plan is drawn for a west facing plot and is aligned with Vastu principles, with proper ventilation and natural light in every room.
The estimated construction cost for this 39x45 house plan is Rs 1.2 crore to Rs 1.5 crore for 7,020 sq ft of built-up area (Rs 1,700 to Rs 2,100 per sq ft, excluding land).
This 39x45 house plan includes 5 bathrooms and 1 kitchen.
Yes, you can request up to two modifications to adjust room sizes or layout according to your preferences.
This house plan is designed for a plot 39 ft wide and 45 ft deep, a plot area of 1,755 sq ft.
4 marla house design
residential floor plan
4 marla house design pictures
4 storey building elevation designs
Commercial Building
3D Elevation
Workstation Design
Commercial Project
commercial building elevation design
residential cum commercial building
residential cum commercial building elevation
2d elevation for residential house
4 storey building floor plan
4 storey building exterior view
39x45 House Plan
Read More Read Less
Happy Customer
In-House Team
Cities Covered
Project Traceability
This Floor plan can be modified as per requirement for change in space elements like doors, windows and Room size etc taking into consideration technical aspects.
Detail drawings can be purchased Like Door- Window, Staircase, Structure, Electrical & Plumbing etc for which is mandatory for any construction to be followed onsite
CAD file of floor plan can be purchased with complete dimension and furniture layout, which can be modified by any Engineer or Architect for further changes
| Item | From | To |
|---|---|---|
| Mason (मिस्त्री) | ₹ 107975 | ₹ 142527 |
| Shuttering Carpenter | ₹ 72932 | ₹ 96280 |
| Painter | ₹ 7131 | ₹ 9414 |
| Labour | ₹ 204967 | ₹ 1270556 |
| Blacksmith | ₹ 19955 | ₹ 26341 |
| Total | ₹ 00000 | ₹ 00000 |
| Item | From | To |
|---|---|---|
| Earth Work & Excavation | ₹ 22800 | ₹ 28956 |
| Cement Bags | ₹ 133153 | ₹ 152328 |
| Sands | ₹ 231623 | ₹ 280264 |
| Aggregates/Gravels | ₹ 7118 | ₹ 122663 |
| Steel | ₹ 131851 | ₹ 159539 |
| Paints | ₹ 69000 | ₹ 97704 |
| Flooring | ₹ 94875 | ₹ 142313 |
| Granite | ₹ 92000 | ₹ 165600 |
| Glazed tiles | ₹ 57600 | ₹ 97344 |
| Doors | ₹ 346950 | ₹ 487118 |
| Plumbing | ₹ 110857 | ₹ 152429 |
| Electrical | ₹ 94875 | ₹ 123148 |
| Total | ₹ 00000 | ₹ 00000 |
Copyrights © 2026 makemyhouse.com, Mason's Mark Pvt. Ltd.
Venture All Rights Reserved.
Design & Developed by HUMUJ Technology and Consulting.
Click here to consult with us